v1.8 · Reviewed 2026-08-06
7DS Origin Pity Calculator & v1.8 Tools
Plan the current Derieri banner, build three role-specific teams, and compare Guardian Golem inputs without hiding what is official, modeled, or still unknown.
Planning baseline · NEEDS_REVIEW: This calculator models 80/120/160, 50/50, soft pity, and currency cost. The reviewed v1.8 notice does not confirm those rules; the active in-game Rate Info wins.
How to Use This Calculator
Enter your current pity count (how many pulls since your last 5-star)
Select your 50/50 status and how many characters you want
Enter your resources to compare them with the modeled 120-pull point
Pity Calculator
The planner uses a 50/50 scenario; current featured odds remain NEEDS_REVIEW
Results
Next Pull Probability
2.0%
SSR Model (80)
80
pulls away
Featured Model (120)
120
pulls away
Stress Test (160)
160
pulls away
Best
1
pulls
Average
39
pulls
Worst
120
pulls
Below the modeled 80-pull point
Available: 0 pulls (need 80 more = 24,000 Star Memory)
You need 80 more pulls to reach the modeled 80-pull point. Save unless the active rules and your stop point support spending.
Probability Distribution
How the Three-Layer Planning Model Works
This site keeps its historical three-layer model for resource comparisons. It is not a current official rule sheet. Verify every counter and transfer rule in the active banner before spending.
Layer 1: SSR Hard Pity
80 Pulls
The model places an SSR safety point at 80 pulls and estimates soft pity near 65. Both need current in-game confirmation.
Layer 2: 50/50 & Rate-Up Guarantee
120 Pulls
The planner models a 50/50 flag and a featured safety point at120 pulls. Do not infer either flag from a previous banner.
Layer 3: Absolute Worst Case
160 Pulls
160 is a stress-test scenario built from two modeled 80-pull cycles, not a promise about the live banner.
In short: use these values to compare budgets, not to certify a guarantee. Record what the current in-game banner says, set a stop point, and keep the result labeled as a model until the rule is independently verified.
Planning FAQ
Are 80/120/160 officially confirmed for the current banner?
+
Not by the v1.8 publisher notice reviewed here. The calculator preserves 80/120/160 as a planning baseline. Read the active in-game Rate Info before spending.
Does pity carry over between banners?
+
NEEDS_REVIEW. Do not assume the SSR counter, featured guarantee, or 50/50 flag transfers. Treat each banner type and counter separately unless the active in-game rule text explicitly says otherwise.
What does the probability chart represent?
+
A community-estimated 2% base rate with modeled soft pity near pull 65. It is useful for scenario comparisons but is not a validated current probability distribution.
How should I use tickets and Star Memory?
+
Enter the quantities shown on your account. The planner converts Star Memory using its stored cost assumption and adds tickets; verify the live per-pull cost and ticket compatibility in game.
How do I plan a P4, P5, or P7 target?
+
Use Banner Planner and enter the exact number of featured copies your in-game Potential screen says are still required. The site does not guess a universal milestone-to-copy mapping.